Module Work will be maximized in off-site high productivity, lower cost fabrication yards and project execution risk from the overheated on-site labour market will be mitigated
Normally, lifting a module is limited to a vertical direction only, and it is advisable to use 4 or 8-point lifting methods. When designing the lifting lug and sizing the shackle, it is recommended to err on the side of caution and be conservative in your approach.
CoG (center of gravity) control, as well as managing the effects of braking and acceleration, are integral components of land transportation. In addition, horizontal loads caused by road grade and superelevation must also be considered.
Design the accelerations for module sea transports based on motion criteria according to the class of ship
Review the connection design, assembly drawings and detail element drawings
Our site engineers review and approve the site construction work representing the owner.
The Kansanshi mine, the largest copper mine in Africa, is owned and operated by Kansanshi Mining PLC which is 80% owned by a First Quantum subsidiary.
Provide Piping, Civil & Structural Engineering service for replacing the HeadBox and Surface Condenser for AV Terrace Bay at their existing mill in Terrace Bay, Ontario.
ProWise has been providing engineering support to general contractor for installing the conveyors, Processing pipes, Mechanical ventilation ducts and Access platforms.
ProWise provided turn-key service for boiler replacement. Engineering design, permit, tendering, and construction management.
Provide Engineering Services for TMI for Stack Replacement